EPC projects status obligation

PWD EPC Monitor | Fixed Stable

Project Management (Database)

Primary Details

1. Consultants & Personnel

Consultants & PersonnelSub. DateRem. DateStatusRemarksAction
Design Consultant
Proof Consultant
Safety Consultant
Project Manager
Surveyor
Site Supervisor
Material Engineer

2. Mandatory Submissions

Mandatory SubmissionsSub. DateRem. DateStatusRemarksAction
Land Memorandom
Schedule H
Schedule F Permits (20 Days)
Project Implementation Schedule or Construction program– In line with Schedule-J along with approved Schedule-J
Workzone Safety Plan (20 Days)
Environment Management Plan (20 Days)
Work Programme (30 Days)
QAP (30 Days)
Insurance Policy (CAR)
Comprehensive workman insurance Policy.

3. Engineering Documents

Structural DrawingsSub. DateRem. DateStatusRemarksAction
Plan and Profile
Traffic Diversion Plan
Drone Videography as per 11.16 every calender Quarter
Construction Methodology
MPR & QPR no latter than 10 Days after the close of easch month as per clause 11.7
HPC
Minor Bridge
Major Bridge
Slab drain
Retaining wall
Footway Drain
Rigid Pavement
Drainage Plan
Hydraulic Calculations

4. Statutory Approvals

ApprovalsSub. DateRem. DateStatusRemarksAction
Environmental Clearance
MPCB
Forest Clearance
Tree Cutting Permission
Explosive License
Village Panchayat NOC for borrow area.
Drawing water from River/Reservoir
WC Policy
Quarry Agreements/Permission for Lease
Fire Policy
Camp Office – Copy of Lease/Rent Deed/Conveyance Deed.
Availability of infrastructure like electricity, water, fuel etc. i.e., Bill copies
Insurance of assets mobilised site.
Comprehensive project risk policy (Natural calamities)
Comprehensive workman insurance Policy.

5. Material Approval

MaterialSub. DateRem. DateStatusRemarksAction
Aggregates
Soil
Fly Ash
Cement
Steel
Bitumen
GSB
WMM
GGBS
Admixture 1
Admixture 2
Water
Hume Pipe/Arcoduct
Bituminous Mix Designs
Concrete Mix Designs
Trial Patch
CTE and CTO (All Plants and Crushers)

6. Details of site mobilization including details of base camp, list of construction equipment, Manpower to be deployed etc.

MobilizationSub. DateRem. DateStatusRemarksAction
Ready Mix Plant
Batch mix Plant
Drum mix Plant
Crusher
Lab Setup
Calbration Certificate
Machinery
Manpower
Camp Office – Copy of Lease/Rent Deed/Conveyance Deed.