1. Choose or Create Project Baseline
Selected Target Requirements Matrix:
| Material / Mix Component | Required Min Quantity |
|---|
Add New Project Requirements Profile
2. Contractor Profile Action Panel
Instructions:
1. Select an existing contractor above to pull up their information to update.
2. To add a new contractor, make sure the dropdown reads "Create New Contractor Profile", fill in the data grid below, and click save.
Add / Edit Contractor Data Structure
Executed Projects Log Data (Minimum 5 different projects required for qualification check)
3. Live Comparative Evaluation Report
This evaluation matches the contractor's accumulated experience metrics against the Active Project Selected in Step 1.
| Contractor Corporate Name | Submissions | Technical Standing | Scrutiny Matrix / Shortfall Disqualification Analytics |
|---|
0 Comments